Showing posts with label maintenance. Show all posts
Showing posts with label maintenance. Show all posts

Mooring Work

Sunday 16th March 2025


0000 hrs

Lat: 50° 24.33' N   Long: 004° 12.32' W
The Mooring

1200 hrs

On a bright sunny Sunday morning I popped down to the boatyard as some packages had arrived! The largest was a new set of mooring strops from Jimmy Green's in Beer. The smallest was a pack of four drawing board clips, my solution to charts flying off the chart table in a seaway.

Given the number of boats that had come off their moorings over the winter, it has been quite a windy one, I decided to move up from 18mm to 20mm strops. The quality of the work from Jimmy Green is outstanding.

Arrived at the sailing club and did my new exercise routine, pumped up the dinghy, and fetched the outboard motor from the shed more exercising, starting it for the first time in eighteen months. Actually, it started after a few pulls which secretly I was quite pleased about.

The visit was timed to coincide with low water springs in order to change the mooring strops. With the tide ebbing I started with the down river strops as they were slack. The first issue was undoing the shackles and much to my surprise it was not as difficult as I anticipated, due to the greasing the threads.

Being careful not to drop the pin or shackle into the water I removed the old strop and replaced it with the new one then worked my way back to the boat and tied onto the new strop. With both new strops on I nipped up the shackle and locked it with a zip tie.

An addition to the strops this year is adding some pipe lagging made of closed cell foam in order that they float and to discourage the growth of aquatic life, mussels in particular and a protective plastic tubing to stop chafing.

Back onboard it was time to adjust the length of strop - I had ordered them a metre shorter, but still think they are too long. With the foredeck all set it was time for coffee and wait for the tide to turn.

Sat in the cockpit with coffee in hand I watched the tide move up river. A line of foam and bubbles moving up stream with larger ripples behind that line.

With the upriver strops loose it was time to change them. Same process, but with a much stronger tide running under the dinghy.  Still not 100% happy with the length of the strops, but will adjust them over the next few weeks. 

1700 hrs

Time to close the boat up and get back to shore, deflate the dinghy exercise and head home.

There had been quite a few boats returning from a sail, what was really nice to see. I still need to get the sails bent on before I let go the lines.

All times are UTC.


The Mast is Stepped

Tuesday 4th March 2025


0000 hrs

Lat: 50° 24.04' N   Long: 004° 16.92' W
Trellugan Boatyard, Cornwall

With the boat being booked for launch on the 5th of March I was down at the yard for a few days before making sure the engine ran and to clean the worst of the green algae that covered the decks.

On starting the engine we discovered that the work done on the water pump, replacing one of the lip seals had not fixed the problem, but was liveable with on the short journey down to the mooring. I also discovered where the fuel leak was!  Again liveable with for the trip to the mooring, but will need fixed before we take the boat to sea.

Given the dreich winter we have had the yard was bathed in warm sunshine and lots of people were down and preparing hulls to be antifouled and it was good to wander about the yard chatting to people and hearing of their plans for the summer. 

unstepped mast

The mast waiting to be stepped

The yard had two jobs to do, step the mast and moved Aphrodite to the top of the slope to the river in readyness to be launched just before high water. 

Just after lunch the team arrived and I let them get on with it.  The last thing they wanted was an owner looking on while they carefully lifted the mast and positioned it on the deck.  From afar I watched the process and once they had the mast up spoke to Dan to make final adjustments to the halyard catcher so the tension was correct.

1600  hrs

The yard tractor, with launch cradle lumbered into sight and I wander off to chat with another owner. 

It took some time of toing and froing to get the cradle in the correct position, I was beginning to think that Aphrodite had taken root, as there was an awkward angle between a couple of boats that had to be negotiated.

Tractor

Toing and Froing

Eventually, I heard the clatter of props falling and knew that the boat was on the cradle.  Now just the need to reverse the process, all done quietly without any panic.  Aphrodite was then moved to the top of the slope down to the river ready for launching just before High Water.  The ladder onto the boat was at the top of quite a long slope and I needed to be careful not to fall off!


The Mast is Un-Stepped

Saturday 22nd February 2025


Finally, after weeks of dreich, windy weather with a named storm thrown into the mix, Éowyn was particularly wild, the yard were able to get the mast unstepped from the deck.

I arrived down at the yard to see the mast off the boat and looking rather green with alge. The first job was to find a bucket, hot water and a brush and start the job of cleaning the muck off. Surprizing how long that took, but very pleasing when I finished.

The next job was to sort out the halyards, knowing I had already caused one mousing line to fall down the mast did complicate the job. Just a matter of working out how to use the existing halyard to pull a new mousing line through then use that to thread the genoa halyard through.

A mousing line was attached to the bottom of the main halyard and then drawn up the mast. The next challenge was to pull the thin mousing line out of the gap beneath the sheaves then thread the halyard round the sheave, attach it to the mousing line, feed all of the lines back into the mast and pull gently.

Flushed with success I proceed to the topping lift only to lose that line and had to repeat the 'rescue' process again! I have replaced the topping lift with a second 10mm halyard as this gives me a spare should there ever be a problem with the main halyard.

With all of the halyards safely back on the mast it was time to move to the radar reflector and attach a couple of lines from the cap shroud round the reflector then off to the other side. This is to stop any halyard from being trapped behind the reflector. Something that has happened a couple of times and is a pain in the derriere to fix at sea.

I hope all my measuring works out, but if necessary can always go up the mast and tweak it when afloat - not that I enjoy going aloft!

The final job was to sort out the deck light. Having found out what make of lamp fitting it was I ordered a lamp from Boatlamps that had arrived on the day before I down. It fitted, but was not getting any power. Time to strip the fitting and find out what was going on with 40 year old wiring. As a result I've chopped the wiring and am re soldering the connections to make it easier to fix in the future.

Flag halyards replaced as they were getting rather sun damaged and breaking up.

Just the lazy jacks to sort out.


Updated: 24/02/2025

Heat for Old Bones

Sunday 15th December 2024


Adding a Heater

I've finally got round to getting a Chinese Diesel Heater for the boat and some bits and bobs so it can be plumbed in to a boat. Having got all the stuff, have it laid out in the cabin ready for several holes to be drilled in the boat for exhaust output and hot air ducting into the cabin.

Once I work out where exactly in the cockpit locker it is going, I need to route the diesel from the tank and the electrics from the house battery and switch in the cabin so I can start drilling.


Updated: 15/12/2024

Winters Work - A Moveable Feast

Sunday 24th November 2025

A post that will move in time over the winter as I record the jobs I need to do and when I have done them.

The Mast

There are a number of jobs that I need to do on the mast. Having discussed them with the yard I've decided to have it unstepped, do the work at ground level, then get it stepped again. I can then work at my own pace and ensure that the work is done to my satisfaction.

I no longer have a head for working at height.

The Windex

The windex has a habit of 'helicoptering' on certain points of sail, it whizzes round and round, as the masthead lights give an odd airflow. Which while not critical is a mild source of both amusement and irritation.

Either I need to raise the pointer higher on the antenna or get a new bracket to move the entire antenna above the level of the lamps.

Radar Reflector

On several occasions I've had halyards get trapped behind the radar reflector, easy to do it you are single handed and not controlling tension on the line, but a real pain in the butt to get the line back to its correct place.

My cunning plan is to run a line from the port shroud round the front radar reflector, perhaps with a clove hitch round the reflector, and connect it to the starboard shroud. The idea being the halyard cannot get behind the reflector.

Lazy Jack Connectors

Currently the lazy jacks run about three quarters up the mast, go through a block that is connected to the mast via a couple of D connectors that are pop riveted on. As a result I consider the slot that the sail falls into when lowering to high and narrow.

Planning remove the D connectors and blocks from the mast and have the lazy jacks over the spreaders, perhaps in plastic tubing to prevent chafe.

Mousing Lines

I've lost one of my mousing lines!

This needs replacing. I suspect that I'll just get all the halyards in place with the mast down.

Sail Track Clean

In my ownership I've not cleaned the sail track, just added more and more silcone lubricant. Now it the time to give the track a good clean.

Steaming/Deck Lights

The bulb of the steaming light is unknown and the deck lamp is missing.

Need to record the steaming light and sort out a deck light.

Replace the Topping Lift

The topping lift is of unknown age. I've decided to replace it with a second 10mm line that I can use as a spare main halyard.


Updated: 04/12/2024

Bleeding Screws

Tuesday 5th March 2024

With the weather finally improving I popped down to the boat to start the list of jobs that need doing. The first one was to sort out that secondary fuel filter air leak where the bleed screw is.

Knowing that the bleed screw was not an original I purchased the correct part from Volvo, how much for a screw with a hole in it! When I came to fit it discovered that in the past that somebody had cross threaded the hole and replaced the bleed screw with a bigger bolt hence the problem with air ingestion.

I dropped into the engineering shed at the yard to speak with Donald and arrange a visit to the boat, the hole re-tapped and a bigger bolt to be used, but hearing that I had an original Volvo bleed screw came up with a better solution. Drill out the hole, fit and glue in a 'sleeve', I am sure it has a technical name, with the correct thread for the Volvo bleed screw and job done.