Sailing Aphrodite

The Adventures of the Sailing Vessel Aphrodite and her Skipper.

▼
Showing posts with label maintenance. Show all posts
Showing posts with label maintenance. Show all posts

Mooring Work

›
Sunday 16 th March 2025 0000 hrs Lat: 50° 24.33' N   Long: 004° 12.32' W The Mooring 1200 hrs On a brigh...

The Mast is Stepped

›
Tuesday 4 th March 2025 0000 hrs Lat: 50° 24.04' N   Long: 004° 16.92' W Trellugan Boatyard, Cornwall Wi...

The Mast is Un-Stepped

›
Saturday 22 nd February 2025 Finally, after weeks of dreich , windy weather with a named storm thrown into the mix, Éowyn was p...

Heat for Old Bones

›
Sunday 15 th December 2024 Adding a Heater I've finally got round to getting a Chinese Diesel Heater for the boat and some bits a...
2 comments:

Winters Work - A Moveable Feast

›
Sunday 24 th November 2025 A post that will move in time over the winter as I record the jobs I need to do and when I have done them. ...

Bleeding Screws

›
Tuesday 5 th March 2024 With the weather finally improving I popped down to the boat to start the list of jobs that need doing....
›
Home
View web version

About Me

My photo
Sandy Garrity
Skipper of Aphrodite
View my complete profile
Powered by Blogger.